|
Contact:
|
Mike Gregory
|
PreBid Date:
|
05/21/2020
10:00 AM CST
|
PreBid Info:
|
The Pre-Bid Walk-Through will be held at the site on May 21, 2020, at 10:00 AM.
|
|
Company:
|
Alvine Engineering
|
Bid Date:
|
06/09/2020
3:00 PM CST
|
Bid Info:
|
Bids will be received at the State of Nebraska, DAS/State Building Division, located at 1526 âKâ St. Suite 200, Lincoln, Nebraska until 3:00 P.M. on June 9, 2020, and will then be publicly opened and read aloud.
|
|
Project Location:
|
Beatrice, NE
|
|
|
|
|
|
Public Notes:
|
Description of Project: Removal of existing multi-zone air handling unit and exterior fluid cooler, piping,
controls, and associated electrical work. Project will include installation of new multi-zone air handling unit,
air-cooled condensing unit, refrigerant piping, limited steam and condensate piping, and controls. Project
will include re-piping steam coil at existing second level air handling unit and duct cleaning at supply air
ducts serving building to the north for which replacement air handling unit serves.
|
|
Job Purchase Information:
|
Bidding Documents may be obtained from A&D Technical
Supply (1822 N Street, Lincoln, NE Phone: 402-474-5454), or by visiting http://www.adtechsupply.com.
Bidding documents will be released upon receipt of a $50.00 deposit, checks payable to A&D Technical Supply
If a bidder requests a set to be mailed, a separate nonrefundable
payment of $20.00 dollars per set, payable to A&D Technical, shall be included to cover handling
and postage.
A digital download of the complete set is available for a non-refundable fee of $20.00 paid to A&D Technical Supply Co.
Deposits will be refunded if all documents are returned in good conditions within 30 calendar
days after the date of the bid opening.
|
|
Addenda
|
|
|
|